Time Lapse Transformer installation

I was commissioned by Morrison’s to photograph the delivery of transformer at the new Swansea sub station. The day involved rocking up at the Swansea docks at stupid o’clock in the morning as this huge piece of equipment was being transported on a special trailer which has two tractor units with independent steering at each end. A most impressive piece of kit in its own right. As the top speed was around walking pace (thats what I was told by my client) it was going to cause some potential mayhem on the roads of Swansea hence the early start to ensure the least impact on the surrounding traffic.